I just need help setting up a math question. I am to infuse at 125ml/hr over the next 24 hrs. And I need to schedule these bags. The first bag is to be hung at 0700. I have looked all over my texts for a setup, and I am probably completely missing it. Can someone point me in the right direction?
lilly2010
3 Posts
Hi Everyone,
I just need help setting up a math question. I am to infuse at 125ml/hr over the next 24 hrs. And I need to schedule these bags. The first bag is to be hung at 0700. I have looked all over my texts for a setup, and I am probably completely missing it. Can someone point me in the right direction?
Thanks-Lilly