i am wondering about the ard dates on the assessments in a swing bed facility, we typically only have the patient in a swing bed for a few days and rarely over 10 days so i set the ard date anywhere from day 1 to day10 since the ard date has to match the d/c date, is this ok to set this on day10 since it falls outside grace days? i do this so i can fill in both of the assessments (5-day pps and d/c) excately the same.
Featured Replies
Join the conversation
You can post now and register later.
If you have an account, sign in now to post with your account.
i am wondering about the ard dates on the assessments in a swing bed facility, we typically only have the patient in a swing bed for a few days and rarely over 10 days so i set the ard date anywhere from day 1 to day10 since the ard date has to match the d/c date, is this ok to set this on day10 since it falls outside grace days? i do this so i can fill in both of the assessments (5-day pps and d/c) excately the same.